top of page
Search

How to Apply for an Act 60 Manufacturing, Industrial Development or R&D Decree: Step by Step

27 minutes ago
7 min read

By Jonathan Braswell, Principal, Executive Services PR · Updated November 25, 2026 · Educational overview, not tax or legal advice.

Short answer

Applications for Act 60 tax decrees are filed online through the DDEC Incentives Portal (incentives.ddec.pr.gov), which DDEC describes as available 24/7 from anywhere. A manufacturing, industrial development or R&D applicant usually works in five phases:

  1. Confirm eligibility under Chapter 6 and choose the rate regime.

  2. Form and register the Puerto Rico entity (Department of State, IRS, Hacienda, labor and insurance agencies).

  3. Get good-standing certifications and permits.

  4. File the decree application on the portal and respond to agency review.

  5. Accept the decree, then comply every year, including annual reports and, for R&D, the annual Accredited Certificate.

Invest Puerto Rico's R&D playbook notes that once granted, incentives may be made retroactive to the application's filing date. That makes an early, complete filing valuable.

This guide is for companies, not individuals. If you are an individual moving to Puerto Rico, see our Resident Investor application guide and the December 31, 2026 deadline guide.

Phase 1: Confirm eligibility and structure

Before forming anything, answer five questions:

  • Which Chapter 6 activity? Commercial-scale manufacturing, key-supplier or cluster services, scientific or industrial R&D, intangible licensing, laboratory-animal breeding, or aircraft and vessel maintenance and repair (Act 60 §2061.01; DDEC brochure). See our manufacturing decree guide for the benefits of each.

  • Which regime? The 4% rate with 12% royalty withholding, or 8% with 2%. The election is made before the decree takes effect and is irrevocable for the decree's life.

  • Which entity, and who owns it? A Puerto Rico corporation or LLC owned by a U.S. group is usually a controlled foreign corporation for federal purposes. Model the 2026 federal rules first.

  • Will you claim R&D credits? If so, design project accounting from the start. See our R&D tax credit guide.

  • Is there a predecessor decree? Buying a plant that operates under Act 73-2008 or Act 135-1997 raises successor-business questions under §2064.01.

Phase 2: Form and register the business

Invest Puerto Rico's playbook lists the standard registrations:

Step

Agency / system

Notes

Register the entity

Puerto Rico Department of State

Online, fee payable by card

Federal EIN

IRS (Form SS-4)

If the entity doesn't already have one

Register with Hacienda

Puerto Rico Treasury (SURI)

Tax registration and Merchant Registration Certificate. Invest PR advises requesting it at least 30 days before starting operations

Employer registration

Department of Labor and Human Resources; State Insurance Fund Corporation

Required before hiring

Single Business Portal profile

Single Business Portal (SBP)

Unique profile for permits and incentives; use permit and other licenses (sanitary, fire prevention, construction) as applicable

Phase 3: Good standing and permits

DDEC expects applicants to be in good standing with the government. Invest Puerto Rico lists the usual documents:

  • Hacienda certification of no debt;

  • Hacienda certification of income tax return filing for the last five years;

  • ASUME (Child Support Administration) certification of no debt;

  • CRIM (Municipal Revenue Collection Center) certification of no debt;

  • certificate of registration or incorporation, articles of incorporation, and a corporate resolution;

  • use permit (permiso de uso) from the Single Business Portal.

For a new entity some certifications reflect a short history. Plan for the time each agency needs, and keep the owners' and affiliates' standing clean too.

Phase 4: File the decree application on the Incentives Portal

On incentives.ddec.pr.gov, the applicant creates a profile and completes the application for the relevant chapter. Expect to describe:

  • the eligible activity and products or services;

  • the location and facilities, including whether it is a PRIDCO building;

  • projected investment in buildings, machinery and equipment;

  • projected direct employment and payroll;

  • the rate regime and any royalty arrangements;

  • R&D plans, if the company will seek the R&D credit;

  • affiliates and any prior decrees.

DDEC charges filing and acceptance fees set by regulation. Confirm the current amounts in the portal when you file, because they have changed over time.

During review, DDEC's Incentives Office (and, for some matters, Hacienda) may request clarifications. Respond quickly and consistently. The application, the financial projections and the transfer pricing approach should tell the same story. Our Puerto Rico transfer pricing guide explains why that matters.

Cash incentives are separate applications

DDEC's cash incentives under the Economic Incentives Fund are applied for separately, each with its own application, committee review and contract. Examples include job creation and retention, PRIDCO building improvements, machinery and equipment reimbursement, and support for innovative small and medium businesses. Lockheed Martin's 2024 Aguadilla expansion of 255 jobs was announced with support from the Puerto Rico Economic Incentives Fund. Ask about these programs at the same time as the decree.

Phase 5: Decree acceptance and year-one setup

When DDEC approves, it issues the decree: a contract between the Government of Puerto Rico and the grantee that sets the terms, the regime and the obligations. The grantee accepts it formally (an acceptance fee applies). Then set up:

  • Annual reports. Decree holders file annual reports through the Incentives Portal. See Act 60 annual compliance reports.

  • R&D certificates. Each year's R&D credit needs its own Accredited Certificate request and CPA agreed-upon procedures. See claiming and selling R&D credits.

  • Municipal and property filings. The decree's exemptions still require correct patente and CRIM filings.

  • Employment and investment commitments. Track the jobs and investment you committed to, because cash incentive contracts and decree terms depend on them.

  • Royalty withholding. Under the regime you elected.

Typical timeline

DDEC does not publish a guaranteed processing time, and it varies with completeness and complexity. In our planning we treat the work as four blocks:

Block

What drives the timing

Structuring and entity formation

Federal and Puerto Rico tax modeling; regime choice

Registrations and good standing

Agency turnaround on certifications and permits

Portal filing and DDEC review

Completeness of the file; speed of responses to requests

Decree acceptance and setup

Internal sign-off; first-year compliance calendar

The single biggest delay we see is an incomplete or inconsistent first filing.

Mistakes to avoid

  • Filing before the regime and the federal model are settled. The royalty election is irrevocable.

  • Ignoring the affiliates' good standing.

  • Promising jobs or investment the plan can't deliver. Cash incentive contracts and decree terms rely on them.

  • Treating R&D as an afterthought. Credits depend on records kept during the year, not reconstructed later.

  • Assuming a predecessor decree transfers automatically.

Decree terms that shape your timeline (Act 60, Subtitle F)

Several provisions of the Code's administrative rules affect how you plan the application. They are often overlooked:

Rule

What it says

Planning point

Effective date (§6020.02)

The decree is effective on the start of operations after it is granted. The start of operations can be the application filing date or a later date set by DDEC, and it can be extended up to five years from filing

File before committing capital where possible. Agree the start date deliberately

Exemption period (§6020.03(a))

15 years, as long as decree conditions are met

Model the full term, not just year one

Extension (§6020.03(c))

A company that complied throughout can ask for 15 more years (30 total) if it shows the extension serves Puerto Rico's best interests

Compliance history is the ticket to an extension

Renegotiation and conversion (§§6020.03(b), 6020.04)

Holders of prior-law decrees can renegotiate or convert. Converted benefits cannot exceed Act 60's

Compare legacy terms (e.g., Act 73 credits) before converting

Transfers (§6020.07)

Transferring the decree, or shares or other ownership interests in the exempt business, requires prior DDEC approval. Otherwise the exemption is void from the transfer date, unless an exception applies or DDEC approves retroactively

Build DDEC approval into M&A and internal reorganization timelines

Annual report (§6020.10(a)(4))

Due 30 days after the return due date, including extensions; DDEC audits compliance at least every two years

Set up the compliance system in year one. See our audit readiness guide

The transfer rule regularly surprises acquirers. A share purchase of a Puerto Rico decree holder needs DDEC approval before closing, or a retroactive approval that is discretionary. Put it on the closing checklist next to regulatory and lender consents.

How Executive Services PR helps

Executive Services PR (founded 2023; 20+ professionals; Licensed Professionals, Tax, & Legal In-House) prepares and files Act 60 decree applications. For manufacturing and R&D clients we run the eligibility analysis, regime modeling, registrations, the portal application, DDEC follow-up, cash incentive requests and the first-year compliance calendar.

Talk to ESPR about your project. Licensed Professionals, Tax, & Legal In-House. Start a confidential Discovery intake or request an Industrial Development consultation.

Frequently asked questions

Where do I apply for an Act 60 manufacturing or R&D decree?

On the DDEC Incentives Portal at incentives.ddec.pr.gov, after creating a profile. Permits and the use permit are handled through the Single Business Portal.

What documents do I need to apply?

Typically: Hacienda no-debt and five-year filing certifications, ASUME and CRIM no-debt certifications, the certificate of incorporation or registration, articles, a corporate resolution and a use permit, plus the business plan, investment and employment projections.

Are Act 60 incentives retroactive to the application date?

Invest Puerto Rico's R&D playbook states that, once granted, incentives may be made retroactive to the filing date of the application. The decree's own terms control.

How long does a manufacturing decree last?

Act 60 Section 2062.05 sets a 15-year exemption period, and DDEC's 2025 brochure notes decrees can be extended for 15 additional years.

Do I apply separately for the R&D credit?

Yes. The decree makes the company an Exempt Business. Each year's R&D credit then needs a DDEC Accredited Certificate supported by a Puerto Rico-licensed CPA's agreed-upon procedures report.

Are DDEC cash grants part of the decree?

No. Cash incentives under the Economic Incentives Fund, such as job creation, equipment or building improvements, are separate applications, each with its own review and contract.

Can I sell my company if it holds an Act 60 decree?

Yes, but a transfer of the decree, or of shares or other ownership interests in the exempt business, needs DDEC's prior approval under Act 60 §6020.07. Without it, the exemption is void from the transfer date unless an exception applies or DDEC approves retroactively, which is discretionary.

Can an Act 60 manufacturing decree be extended beyond 15 years?

Yes. Under §6020.03(c), a business that met its decree conditions throughout the exemption period can request a 15-year extension, for 30 years in total, if it shows the extension serves Puerto Rico's best economic and social interests.

Related guides

Sources

 
 
 

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page